Sunday, May 13, 2012

What happens next

  • Bathroom vanity tops will be installed
  • The rest of the lights will be installed
  • The staircase handrail will be installed
  • Vanity and cabinet hardware will be installed
  • Door knobs will be installed
  • Front walkway step will be poured
  • Front door will be stained
  • Front door hardware will be installed
  • Shower doors installed
  • Mirrors installed, along with other bathroom hardware
And we have to choose the bedroom carpeting. We've also begun thinking about window coverings, since we have 22 new windows to cover. Yowza. We think eight of them can wait for a bit, so we're focusing on the others now. I like our windows, and plan to seek fairly minimal coverings. As cool as these ones are, or even these ones, we'll probably go for something  a little more neutral. Probably.