WE GOT OUR CERTIFICATE OF OCCUPANCY!
Twenty-four days ahead of schedule. Ahead of schedule, y'all. If you stalk renovation forums you know this is the exception, not the rule. We are beside ourselves with *giddiness*.
We had our pre-move-in walk-through tonight. It's all minor stuff, including:
- Paint touch-ups, both inside and out
- Our closet shelves need those tiny white caps on the edges that face the wall
- Front walkway step needs re-trimming (or whatever the correct term is for 'fix the edging of the concrete')
- A small chunk of our old sidewalk needs removing
- The front gutter needs relocating
- A hallway light that finally shipped (back order) needs installation
MOVING DAY!
Stay tuned for moving day and settling in pics, and many before-and-afters!